Free Web Site - Free Web Space and Site Hosting - Web Hosting - Internet Store and Ecommerce Solution Provider - High Speed Internet
Search the Web

Bathroom Remodel

Home Page Closet Remodel Bathroom Remodel Siding Repair Bathroom Remodel Kitchen Backsplash Porch Remodels Kitchen Remodel Handrail Remodel Contact Page

Composite Deck Project

This customer wanted a long lasting maintenance free deck.

Aluminum wall tiles, toilet, and vanity were removed.

 

The medicine cabinet was removed.

 

Tiles were also removed from the shower.

 

First, the walls were covered with moisture resistant paneling,then a new toilet and vanity were installed.

 

Linoleum was glued to the existing floor and trim was added.

 

A new medicine cabinet, light fixture, and electrical wiring were installed.

The original bath was not equipped with  a wall light switch or a grounded outlet. To correct this,the electric lines were rerouted to the light thru a switch and a GFI was added. 

The shower walls were covered with prefab vinyl panels.