Bathroom Remodel
Home Page
Closet Remodel
Bathroom Remodel
Siding Repair
Bathroom Remodel
Kitchen Backsplash
Porch Remodels
Kitchen Remodel
Handrail Remodel
Contact Page
Composite Deck Project
This customer wanted a long lasting maintenance free deck.
Aluminum wall tiles, toilet, and vanity were removed.
The medicine cabinet was removed.
Tiles were also removed from the shower.
First, the walls were covered with moisture resistant paneling,then a new toilet and vanity were installed.
Linoleum was glued to the existing floor and trim was added.
A new medicine cabinet, light fixture, and electrical wiring were installed.
The original bath was not equipped with a wall light switch or a grounded outlet. To correct this,the electric lines were rerouted to the light thru a switch and a GFI was added.
The shower walls were covered with prefab vinyl panels.

